Delayed coker unit, Rijeka Oil Refinery (RNR)

Investor
INA - Oil Industry d.d.
Main project designer
Emil Rohlik, M.Arch.
Project designers

Emil Rohlik, M.Arch.
Ana Novak, M.Eng.Mech.
Željka Hitrec, Dipl.Eng.E.
Marko Kitić, Dipl.Eng.E

Associate project designers

Ana Alar, Dipl.Eng.Arch.
Ivana Knez, Dipl.Eng.Arch.
Martina Stjepandić, M.Arch
Nika Nevečerel, Dipl.Eng.Mech

Location
Kostrena
Year of design / construction
2018
Total area

14.410 m²

Estimated costs
HRK 250.000.000,00
Transport, storage and loading of coke in an enclosed conveyor belt system is part of the Rijeka Oil Refinery facility. The location, dimensions and design of buildings and infrastructure are defined by the technological process, the spatial possibilities on the embankment at the port and strong environmental protection measures. The building for employees and the transport system “hovering” above the plant are shaped as oval cross-section tubes, reducing the impact of wind.